Power capacity improvement
Technical transformation is a kind of technical service to redesign the electricity consumption mode or transform the electrical equipment when the electrical equipment has been unable to meet the actual needs of electricity or cannot operate reasonably. Through technical transformation, customers can realize the effective control of electricity cost and meet the safety requirements of production operation.
High voltage electrical equipment is a kind of power equipment with high safety level and trigger risk in power operation.
1, they have their own green structure, safety protection mechanism, accompanied by a long time of operation and neglect of maintenance, the most likely to become a latent safety failure, the longer, older high pressure equipment should be replaced in time.
2, such as the customer's power load, load increase, the capacity of the original transformer is insufficient, it is necessary to increase the capacity in time, otherwise it will cause the transformer distribution equipment temperature rise, causing safety risks, and load loss tripping.
3, such as the customer's power load, load reduction, the use of the original transformer is insufficient, it is necessary to reduce the capacity in time, otherwise the high-capacity transformer for a long time operation, on the one hand, the power loss is high, is not conducive to power saving, on the other hand, can reduce special costs. They have their own insulation structure, safety protection mechanism, accompanied by a long time of operation and neglect of road maintenance, the most likely to become a latent safety failure, the longer, older high voltage equipment should be replaced in time.
Service | Service object |
Harmonic control | Rolling plant, steel pipe plant, electroplating plant, aluminum plant, etc., there are harmonic sources and harmonic content exceeds the standard |
Improved power factor | Various types of electricity users whose power factor is so low that they are subject to tariff penalties |
Energy-saving technology transformation | The no-load loss of electrical equipment is serious, and there is a waste of energy |
Line reconstruction | The existing line does not meet the safety requirements or the line heat serious types of electricity users |
Capacity increase and capacity reduction analysis and evaluation | The existing transformer is too large and the power consumption is too small, there is a waste of capacity; Or the transformer capacity is too small, full capacity increase, capacity reduction analysis can not evaluate the load needs of all kinds of users |